2023/2024 Improvements

The original hot tub has been removed and will be replaced with a plunge pool from SwimEx.  Extensive demolition and dirt work was needed to create room for the replacement hot tub.

The Crew at SwimEx hard at work on the new hot tub.  There will be maintenance access around the perimeter of the tub, to make for ease of maintenance and access to any potential leaks or mechanical issues.

2021 Improvements

The south deck is being replaced with proper concrete footings so it will not have a wavy affect.  Replaced with new composite decking.

Deck joists freshly painted, deck rebuild and extension, new carpet installed in the south mall 2nd floor, new entry door installation in progress, new stair treads, south deck rebuild and extension

2019/2020 Improvements

So far on the capital plan, the skylights have been replaced. The fire panel has been upgraded and can identify which unit an alarm is going off in. The work in the parking lot has started, and will hopefully be completed in the first week of October. 

2018 Improvements

Pool

Pool

Updated Walls

Updated Walls

Updated Walls

Updated Walls

Updated Walls

Updated Walls

Painted Door and Window

Painted Door and Window

Stair Treads

Stair Treads

Ping Pong !

Ping Pong !

Foos !

Foos !

The pool was drained, cleaned and painted. The older cedar shake shingles were removed around the swimming pool, and the walls were sheetrocked and painted. Sheetrock was patched and painted as needed throughout the complex, and unit doors are being painted now. Stair treads were replaced as needed. We now have Ping Pong and Foosball in the game room!

2016 & 2017 Improvements

Painted The Hot Tub

Painted The Hot Tub

Womens Common Bathroom

Womens Common Bathroom

New Carpet

New Carpet

Booster Clothes Dryer Fans

Booster Clothes Dryer Fans

New HOA Wifi Routers

New HOA Wifi Routers

Stucco Work

Stucco Work

Old Fireplace

Old Fireplace

Option for New Fireplace

Option for New Fireplace

Hot Tub was painted, Stucco work was completed, Women's bathroom: Doors were painted and new counter and sinks installed, Clothes dryer booster fans were added, New carpet on the north side 2nd and 3rd floors,  new WiFi routers were installed, and 2016/2017 owners will choose their options for replacing their fireplaces and flues.

2015 Improvements

Fireplace Area

Fireplace Area

Painted Columns

Painted Columns

Added a new fireplace and sitting area in the south mall.  Painted vertical beams to refresh the paint.

2013 & 2014 Improvements

New Carpeting in the South Mall

New Carpeting in the South Mall

Stair Tread Update

Stair Tread Update

New Luggage Carts

New Luggage Carts

Exterior Decks Stained

Exterior Decks Stained

New Hot Tub Gate

New Hot Tub Gate

Replaced the carpet in the south mall to help update the look of the area.

2011 & 2012 Improvements

Rock Retaining Wall

Rock Retaining Wall

Stucco Repair and Paint

Stucco Repair and Paint

New Pool Cover

New Pool Cover

Hot Tub French Doors Installed

Hot Tub French Doors Installed

Fresh Paint on the First Floor

Fresh Paint on the First Floor

Fascia Repair and Paint

Fascia Repair and Paint

Fresh Paint on Exterior Doors

Fresh Paint on Exterior Doors

Bike Wash Station

Bike Wash Station

South Exterior Re-Shingled; New Rock Retaining Wall; New Bike Wash Station; Exterior Stucco & Paint Repair; New Pool Cover; New Hot Tub French Gates; First Floor New Paint; Fascia Repair & Paint; Exterior Doors Painted